Full fibre broadband lead times.
FTTP full fibre lead times can vary from 3 days to 3 months, depending on the fibre infrastructure in your local area. Choosing the right provider is crucial to a smooth installation, so our dedicated project managers look after your order from start to finish.
Check my postcodeInstallation
Three ways full fibre reaches your building.
Stage 0
0 stage install
Fibre and an Optical Network Termination Unit (ONT) already exist at your premises.
1–3 working days
Stage 1
1 stage install
The fibre optic cable and infrastructure are nearby, but the cable and ONT still need installing.
9–18 working days
Stage 2
2 stage install
Fibre infrastructure is not currently near your premises. A site survey checks how fibre can be delivered.
20–90 working days